With ECW, our team represented the client and used our construction and permitting expertise to guide the project. The project posed an interesting challenge from the beginning. Our client’s property had a portion of the site leased to a government entity tenant....
Sectors
Industrial Projects by Iskagna
Boasso Global
Located in growing Summerville, SC, we assisted our client and collaborated with their tenant, Depot Connect International, on the construction of their new tank wash and service facilities. Sitting on 38.96 acres. the development features an incoming and...
Shipyard Creek Logistic Center
Working with our Savannah, GA-based client, our team was able to offer local expertise on the permitting process in Charleston and support our client through contractor procurement. Early on, we identified several risks and scope gaps that jeopardized the project. We...
CPLC Building 2
At nearly 1 million square feet, CPCL Building 2 is well-equipped to manage the operations of Plastic Express. Located on a 99.68-acre site, it features 99-dock doors, two pop-up towers, and twelve rail doors, along with two ramp access points off Veterans Parkway,...
CPLC Building 1
CPCL 1 is a massive site, with a 1.5 million square foot facility on a low-lying site. As the project manager, we worked closely with previously contracted earthwork movers. Helping Our Client’s Tenant Prepare for Operations We managed the timeline to ensure...
FlexCold
With over 150,000 square feet, this modern cold storage warehouse and logistic company will be ideally situated just miles from the Jacksonville Port Authority (JAXPORT). Together with FlexSpace Ventures and ARCO Design/Build, the project was completed in the summer...
GE Aviation CNC Facility
The GE Aviation CNC Facility, located in Ashville, NC, consists 170,000 SF of office and manufacturing space. Of the overall building, 140,000 SF is manufacturing space and 30,000 SF of office space. The overall project budget was $17.9 Million and the project was...
Mercedes-Benz Parts Consolidation Center
The Mercedes-Benz Parts Consolidation Center, located on Daimler's campus in Vance, AL, consists of 1,000,000 SF of warehouse space and 5,000 SF of office space. Construction was completed in 10-months during an 18-month development period. The overall project budget...