CPCL 1 is a massive site, with a 1.5 million square foot facility on a low-lying site. As the project manager, we worked closely with previously contracted earthwork movers.
Helping Our Client’s Tenant Prepare for Operations
We managed the timeline to ensure construction stayed on track and within budget. Our team saw through the completion of the final slab-on-grade (SOG) pour and truck court pour, given the complexity of the site and logistics required to get all done, which were major milestones for our client.
CPCL 1 includes 308 dock doors and levelers, including two drive-in doors and two 185’ 185-foot truck courts, making it a prime cross-dock logistics hub along the important shipping port of Savannah.